BAOHENG | AS/RS PLASTIC PALLET RFQ CHECKLIST Revision: 2026-10-21 | Language: English Guide: https://www.baohengasrs.com/resources/insights/asrs-plastic-pallet-selection-guide/ Enquiries: https://www.baohengasrs.com/contact/ Fill in what you know. Mark unknown fields TO CONFIRM. Use the full family + model + configuration when naming a pallet. This is a requirements worksheet, not a test report or product approval. 1. PROJECT Company / contact: Project country: New installation or replacement: Required quantity: Target schedule: Current pallet family / model, if known: Available photographs / drawing references: 2. UNIT LOAD Goods weight (kg): Packaging weight excluding pallet (kg): Payload including packaging, excluding pallet (kg): Pallet weight (kg): Total loaded mass including pallet (kg): Package type / number of packages: Loaded footprint and height (mm): Contact pattern / local contact areas: Centre of gravity / off-centre load: Overhang / load securing method: Other load patterns needing review: 3. PALLET AND SUPPORT Required length x width x height (mm): Fork / lifting clearances (mm): Travel and entry directions: Drawing revision / required tolerances: Rack, rail or platform support: Clear support span (mm): Contact width and position (mm): Support direction (attach a sketch): Longest loaded storage time: 4. EQUIPMENT INTERFACES System provider / equipment reference: Roller spacing or chain positions: Shuttle / stacker crane / lift interfaces: Transfer gaps and changes of direction: Lifting points / stops / centring guides: Sensor position and target surface: Equipment-specific limits / acceptance document: 5. ENVIRONMENT AND CONFIGURATION Normal / minimum / maximum temperatures by process stage: Cleaning method / relevant chemicals: Required deck and base design: Material specification to confirm: Reinforcement quantity / position / specification: Required certificates or other records, if applicable: Mandatory features: Preferred colour / logo / label / RFID requirements: 6. SAMPLE AND QUOTATION Sample configuration / ID / drawing revision: Trial load, support, environment and duration: Critical handling transitions to check: Acceptance criteria and responsible parties: Required inspection or test records: Open items before production approval: Packing / destination / delivery scope for quotation: Agreed configuration and change-review process: