AS/RS PALLET SAMPLE ACCEPTANCE CHECKLIST BAOHENG | Revision 2026-10-27 Guide: https://www.baohengasrs.com/resources/insights/asrs-pallet-sample-testing-checklist/ Use one copy per sample configuration. This editable planning template is not a standard test procedure, certification or a completed test report. Agree methods and acceptance limits with the pallet supplier and system provider. Use PASS / PENDING / FAIL / NOT APPLICABLE and explain every exception. 1. PROJECT AND RESPONSIBILITY Project / location: Buyer / contact: Pallet supplier / contact: System provider / contact: Test plan reference / revision: Review date / witnesses: Person authorised to approve: 2. SAMPLE IDENTITY Sample ID(s) / quantity: Product family + model: Drawing reference / revision: Supplier quotation reference: Material specification: Deck / underside configuration: Reinforcement specification / quantity / positions: Specified and measured pallet mass: Available batch identification / sample date: Top / underside / side / marking photograph references: Does this match the proposed production configuration? Evidence / status: 3. LOAD AND ENVIRONMENT Payload (goods + packaging, excluding pallet): Total loaded mass (including pallet): Package type / layout / deck contact pattern: Loaded height / overhang / off-centre loading: Securing method / stretch wrap: Normal and extreme operating temperatures by process stage: Longest loaded storage time: Cleaning / exposure / special documentation requirements: 4. DIMENSIONS AND CONDITION Record each as: feature | drawing requirement | agreed tolerance | measured value | measuring method / equipment | photograph reference | status. Length: Width: Height: Fork openings / pickup clearance: Runner contact widths and positions: Critical edge / guide / stop dimensions: Loaded envelope / profile-check result: Visible damage / condition: Other agreed features: 5. RACK AND LOAD-PERFORMANCE REVIEW Support type / direction / clear span: Support contact width / positions / drawing reference: Load distribution / temperature / duration: Applicable report reference / tested configuration / review conclusion: Additional evaluation procedure and agreed limits (if required): Measurement positions / equipment: Observations under load / after unloading: Evidence reference / exceptions / status: 6. EQUIPMENT TRIAL Approved trial procedure / operating conditions: Travel orientations / load patterns / agreed cycle count: Equipment settings / trial date / sample IDs: Record each as: station | load | conditions | acceptance criteria | actual result | exception / video reference | status. Infeed / centring / profile check: Conveyor transitions / transfer gaps / accumulation: Lift / shuttle / stacker-crane pickup: Rack placement / retrieval: Outfeed: Sensor detection / positioning / package movement: Other relevant stations: 7. OPEN ITEMS AND RETEST Item / observation / owner / action / review date: Change made before retest: Retest procedure / sample ID / evidence / result: Untested conditions (keep PENDING): 8. RELEASE Final status: APPROVED / PENDING / REJECTED Approved sample ID(s) / drawing revision / complete specification: Applicable load / support / equipment route / environment: Restrictions / unresolved items: Material / tooling / reinforcement changes requiring renewed review: Production conformity and batch inspection requirements: Approval name / role / date / signature: Supplier and system provider acknowledgement: Attach the photographs, measurements, reports and trial records referenced above. Retain the approved specification with the quotation and purchase order.