AS/RS PALLET STRETCH-WRAP AND INTERFACE REVIEW BAOHENG | Planning and acceptance record | 9 November 2026 This is a project record, not a test procedure or an equipment approval. Packaging and automation providers must define the acceptance criteria. PROJECT AND CONFIGURATION Project / site: Review date / responsible reviewers: Pallet family and model / drawing revision: Sample IDs / travel and pickup orientation: Goods / loading pattern / packaging: Payload mass / complete unit mass: Finished wrapped length x width x total height: Film specification / batch reference: Wrapper model / recipe reference: Film anchoring area / lower-edge position / finish method: DRAWING AND PHOTO REFERENCES Four-side finished-load photos: Marked pickup openings and equipment travel path: Marked underside support and conveying contact areas: Marked stop, guide and centring faces: Marked sensing targets and label-reading areas: CRITERIA TO AGREE BEFORE THE TRIAL Load-restraint assessment method and requirement: Film start / finish attachment and loose-tail criterion: Approved finished profile and positioning allowance: Required pickup, support and sensing clearances: Loads / operating conditions / speeds / repeat counts: Safe inspection and rework location / site procedure: OBSERVATIONS (PASS / HOLD / NOT TESTED; ATTACH EVIDENCE) Film start and finish secured at wrapper exit: Film condition after handling sequence: Pickup entry / withdrawal without film interference: No film interference at required support and transfer contacts: No interference at stops, guides or centring faces: Finished outside profile within agreed requirement: Load restraint / movement / packaging damage observations: Presence detection and identification-reading results: Station IDs / event references for exceptions: Before-and-after photo references: RELEASE AND CHANGE REVIEW Decision: approved / conditional / unresolved Approved configuration and trial scope: Exceptions / actions / owner / due date: Packaging reviewer / date: Automation reviewer / date: Pallet configuration confirmation / date: Who reviews later pallet, goods, film, recipe or route changes: Article: https://www.baohengasrs.com/resources/insights/asrs-pallet-stretch-wrap-clearance/